Press releases

New STS container cranes under fabrication

2010.11.15

Fabrication port side to build installations for another two Ship-to-Shore STS Quayside container gantry cranes   

The electrical and mechanical engineering installations for these two Ship-to-Shore STS Quayside container gantry cranes will be done at our fabrication port side. And the final assembly installations are to be carried in customer’s port side as part of the expansion plans for the existing container terminals.


These two ship-to-shore container cranes are used for loading and unloading container ships, together with four Yard rubber-tyred gantry (RTG) cranes to transport containers to and from temporary storage in the port terminal. These cranes installations are due for delivery in early next year.


Top