HGC brief
Entrenched in Group vision of Heavy Industries engineering excellence, and Green operating philosophy:
Integrated Production Bays
Production Bay no.1 (Yangzhong base)
Self-operated own jetty:
Latitude: 32°3′15.61″ North
Longitude: 119°54′40.76″ East
Integrated Production Base Belt & Ports along Yangtze river for
both Shipbuilding & Port Machinery & GreenLogistics :
Port Length total (Phase I & II, Phase II with 900meters jetty extension) :
Jetty 3 km, Water depth 8 m-12 m, for 30,000 – 50,000 DWT Vessel
Production base: 600,000 m2
Facility: 30,000 tons semi-dock slipway, 20,000 tons indoor slipway.
With 320m quay berth for direct loading along Yangtze river,
with 60T & 150T & 280T lifting capacity LLC for assembly at 200,000m2 yards for the best delivery time with products fully erected shipped/main parts assembly.
Our entire production bay
(Shipbuilding, Offshore, Heavy industries, and Port Operation),
is about 2,000 people.
and total capacity,
if converted into tons, is about 100,000 tons per year.
Port Operation License
Production Base & Port Operation Permit from
Ministry of Transportation & Port Authority
Processing Facilities:
Semi-dock berth (216m x 56m) with 200T Gantry Crane(outdoor slip-way)
Indoor slip-way (32m x 180m) with 200T Crane
Outfitting Quay with 60T Crane
Production yard with 150T and 280T Lifting capacity LLC Cranes for installation and erection
Pretreatment line of steel plate (Type LCQ69250, Size 2500mm)
Plasma cutting machine (Type kpm-6000)
Four-roll NC bending machine (WB 12KV – 140 x 3000)
Frame cold bending machine (Type qcwl-160t, size 160T)
Numerical control pipe bender (QW114NC, Φ114)
Hydraulic machine (500T)
Bending machine (160T)
Shearing machine (2.5m)
Indoor workshop of outfitting fabrication
Indoor workshop of block assembly with 150t crane
Outdoor block assembly ground
Painting(3 rooms) and sand-lasting(2 rooms) workshop
Two blasting and three paint painting workshop to meet PSPC requirements. Each room is 20x18 meters in size and about 12 meters in height. The painting room is equipped with ventilation and dehumidification equipment, environmental monitoring equipment, sand blasting equipment and sand absorption.
The sandblasting room is equipped with 8 electric control sandblasting machines with two tanks and two guns, which has low labor intensity and high production efficiency.
It is equipped with shop primer spraying equipment, paint mixing equipment, rust removing polishing machine, pressure sprayer, such as coating equipment, in line with the
CB/T3000 level II steel general and spraying equipment production enterprise.
List of Main Production facilities
Items | Spec. | Maximum design product ) nage | ||||
Length(m) | Width(m) | Deep(m | ||||
Slip-way | 216 | 56 | — | 30000DWT | ||
Indoor Slip-way | 200 | 31 | - | 15000DWT | ||
Outfitting Quay | 268 | 20 | >10 m | 50000DWT | ||
Items |
Type | Maximum lifting capacity |
Location | |||
(T) | ||||||
Hoisting facility | 1 | Gantry crane | 200T | Slip-way | ||
2 | Bridge crane | 200T | Indoor Slip-way | |||
3 | Gantry crane | 100T | Slip-way | |||
4 | Portal crane | 60T | Outfitting Quay | |||
5 | Bridge crane | 150T | Block shop | |||
6 | Gantry crane | 100T | 1#Block assembly field | |||
7 | Gantry crane | 100T | 2#Block assembly field | |||
Paint shop | Sand blasting:20*25m, 2 rooms | Paint:20*25, 3 rooms | ||||
Shop rooms | Items | Area(m2) | Purpose | |||
Production place | 1 | South of cutting shop | 6213 | Steel cutting | ||
2 | North of cutting shop | 6213 | Fabrication、Machining | |||
3 | Pipe shop | 5500 | Pipe fabrication | |||
4 | Block shop | 8502 | Block assembly | |||
5 | Block assembly field | 18360 | Block assembly | |||
6 | Erection field | 7380 | Block erection | |||
Warehouse | 1 | Bonded area | 980 | Import equipment storage | ||
2 | General area | 2080 | General storage | |||
3 | Mechanic area | 600 | Mechanic storage | |||
4 | Weld material library | 160 | Weld material storage | |||
5 | Paint store | 210 | Paint storage | |||
6 | Steel store | 8320 | Steel storage | |||
Other |
1 | Power distribution room |
350 |
Power distribution | ||
2 | Pump room | 150 | Air supply |
Production Bay no.2 (Taizhou base)
Self-operated own jetty:
Latitude: 32°16′ North
Longitude: 119°52′ East
Integrated Production Base Belt & Ports along Yangtze river for
the Shipbuilding :
building various types of Bulk Carrier, Container Vessel and Oil/Chemical Tanker with capacity up to 80,000 DWT.
Port Length total :
Jetty 2000m, Water depth 8 m-12 m, for 30,000 – 80,000 DWT Vessel
Production base: 400,000 m2
Facility:
Shipbuilding area: 400,000 m2
1x 80,000 DWT slipway with 500T gantry crane;
1x 70,000 DWT slipway with 500T gantry crane;
2x 20,000 DWT slipways with 200T gantry crane;
3km shoreline and 2.0km wharf;
3x blasting chambers + 6x painting chambers;
Production Bay no.3 (Taixing base)
Self-operated own jetty:
Latitude: 31°59′ North
Longitude: 120°00′ East
Integrated Production Base Belt & Ports along Yangtze river for
the Shipbuilding :
building various types of ships and Marine equipment under 70,000 tons
Port Length total :
Jetty 250m, Water depth 8 m-12 m, for 30,000 – 70,000 DWT Vessel
Production base: 160,000 m2
Facility:
one berth of 230 meters ×62.5 meters,
one berth of 235 meters ×58 meters,
one berth of 235 meters ×51.5 meters
one berth of 230 meters ×120 meters.
Three steel structure production workshops, hull preparation workshop, engine workshop, one spray and two painting standard workshop, standardized warehouse; There are 200T, 150T, 80T and 50T lifting capacity Gantry yard cranes, distributed in three slipways, and two 25T lifting capacity Gantry yard cranes distributed in the block fabrication area.
Production Bay no.4 (Nantong base)
Self-operated own jetty:
Latitude: 32°08′ North
Longitude: 121°29′ East
Integrated Production Base Belt & Ports along China Yellow Sea for
the High-end equipment (structural modules), offshore engineering oil and gas drilling platforms, offshore wind power projects (towers, monopiles, jackets, converter stations, booster stations, etc.), shipbuilding and offshore engineering construction, offshore engineering support, etc.
Port Length total :
Jetty 300m, Water depth 8 m-14 m, for 30,000 – 100,000 DWT Vessel
Production base: 190,000 m2
Facility:
Processing workshop: 360m x 30m + 360m x 36m, height 26m.
Platform no.3:
300m x 76m, equipped with two nos Goliath Gantry Cranes(GGC), for wind power installation platforms.
One 300-ton GGC with rail gauge of 76 meters and height of 60 meters.
One 500-ton GGC with rail gauge of 76 meters and height of 80 meters.
Port: Equipped with 800t-Lifting-Capacity port crane (lifting height 150 meters)
Platform no.4:
Equipped with two nos 1500T Goliath Gantry Cranes(GGC)
with rail gauge of 82 meters and height of 90 meters.
Grand Harbor basin: 130m x 56m, water depth -9m.
The production bay for the best delivery time with products fully erected shipped/main parts assembly.
The production bay
(Shipbuilding, Offshore, Heavy industries, and Port Operation),
is about 2,000 people.
and total capacity,
if converted into tons, is about 200,000 tons per year.
List of Main Production equipments
Type | Items | Qty | Unit | Spec. | Remarks |
Steel Pre-treatme nt line | Steel pretreatment production line | 1 | Line | 5*12M | More than 5mm steel plate Wide flat and profile
|
Paint equipment | Blasting and dehumidifier | 1 | set | 8 sets | Paint shop |
Steel cutting / forming equipments
| Hydraulic machine | 1 | set | 500T | Steel forming |
CNC frame cold bending machine | 1 | set | 160T | ≤280mm bulb flat bar | |
CNC plasma cutting machine | 4 | sets | 260 | ≤30mm steel plat cutting | |
NC Flame cutting machine | 1 | set | ≤30mm steel plat cutting | ||
Semi-automatic flame cutting machine | 30 | set | |||
CNC tube bending machine | 2 | sets | Maximum bend diameter 114mm, Max thickness 7mm | ||
Steel plate shearer | 1 | set | ≤20mm | ||
Machine equipment | Lathe | 2 | set | C6150-1500 | |
Planer | 1 | set | |||
Miller | 1 | set | |||
Welding machine | Gantry crane | 3 | sets | 100T | |
Gantry crane | 1 | set | 200T | ||
Bridge crane | 2 | set | 200T | ||
Shop overhead crane | 15 | sets | 10-50T | ||
Portal crane | 1 | set | 60T | ||
Portal crane | 1 | set | 150T | ||
Portal crane | 1 | set | 280T | ||
Port crane | 1 | set | 800T | ||
Transportation equipment | Heavy platform lorry | 1 | set | 100T | |
Heavy platform lorry | 1 | set | 200T |